Product Guide

Drywall Partition in Singapore: How a Gypsum Board Wall Is Built, and When It Is the Right Wall

Newly built drywall partition with two door openings in an HDB flat, finished with a new dark floor

A drywall partition is a metal frame with gypsum boards fixed on both sides, skimmed and painted so it looks like any other wall in the room. It is the lighter, quicker way to split a room, and it suits most rooms, though it feels less solid than a 63mm hollow block wall. In an HDB flat it needs no renovation permit, as long as the new room gets light and air and the way out stays direct.

What is a drywall partition made of?

Drywall and gypsum partition are two names for the same wall. A metal frame goes up first, and gypsum boards close it on both sides. If sound matters, rock wool goes inside the frame before the second side is boarded. The finished wall is skimmed and painted to match the rest of the room.

Gypsum board is only one part of it. The frame, the door opening and the finish around the floor decide how the wall turns out.

How is a drywall partition built?

  1. Mark the wall. At the site visit we mark where the wall goes and check three things: light, air and the way out.
  2. Build it. The frame goes up and the boards go on, leaving the door opening.
  3. Close it up. The wall is skimmed and painted, and the door is fitted.
  4. Finish the floor. New vinyl or tile is cut to the wall, with skirting.

The last step is the one that gets left out of many plans. A new wall creates a new edge where wall meets floor on both sides, and that edge needs skirting. Our vinyl skirting guide covers keeping, replacing or covering the old skirting, and if the new room is a bedroom, our bedroom flooring guide helps with the floor itself.

What is a drywall partition good at?

  • Speed and weight. Gypsum is lighter and quicker to put up than hollow block, which is why it suits most rooms and offices.
  • No plastering. A hollow block wall has to be plastered on both sides. Drywall is skimmed and painted instead.
  • Range of uses. We build partitions in HDB flats, condos, offices and shops. At home that means a study, an extra bedroom or a store room. In an office it is a meeting room, a manager's room or a store, and in a shop a back room, a store or a changing room.

Where does a drywall partition fall short?

  • It feels less solid. It is a framed wall, and it feels like one. A plastered hollow block wall feels more solid.
  • Heavy things need planning. If a TV, wall cabinets or loaded shelves will hang on the new wall, tell us at the site visit. It can change which wall type we suggest.
  • Sound gets through. A partition cuts noise; it does not stop it. Rock wool inside the frame helps, and so does taking the wall all the way up to the ceiling. Doors and gaps still let sound through, so a quiet study depends on the door as much as the wall.
  • Taking it out later is a permit job. In an HDB flat, removing drywall needs a permit and HDB's approval, and the drywall must be removed in full, joint to joint.

What does HDB allow for a gypsum partition?

A gypsum partition needs no renovation permit in an HDB flat, as long as it meets three conditions:

  • If it creates a room someone will live in, that room needs adequate natural light and ventilation. Check where the window falls before you fix the line of the wall.
  • The fire escape route must be direct, for example from the bedroom door to the main door, and not through another room.
  • All fasteners can be no more than 6mm in diameter, with a penetration depth of no more than 40mm.

The work still goes through a contractor from HDB's Directory of Renovation Contractors. Our HDB renovation permit guide lists the jobs around a new room that do need a permit, such as removing an old wall or moving a door entrance.

Partition planner

Tell us what the new room is for. We will suggest a wall type and list the HDB checks that matter for it.

What is the new room for?
A door in the wall?
How much does sound matter?
Hanging heavy things on it?

Gypsum board or hollow block?

A 63mm hollow block wall is one layer of block, plastered on both sides, and it feels more solid. That is why some owners pick it for a wall that will carry a TV or shelves. It takes more work: plastering both sides, and an RC lintol over every door or window opening, which HDB requires. Gypsum is lighter and quicker, and it suits most rooms and offices. We advise on the choice at the site visit, once we have seen the room.

What if an old wall has to come out first?

If the new layout means removing an existing partition, we hack it out, bag the debris and carry it away, then build the new wall. In an HDB flat, removing the old wall needs a permit and HDB's approval before work starts. Our hacking and demolition page covers that side of the job.

How is a drywall partition quoted?

Per project, after a free site visit. We build the wall, fit the door and finish the floor around it with our own crew. Send Kayler a photo of the room and your unit type on WhatsApp at +65 8118 5520, and we usually reply the same day. See our partition wall page for how the job runs, and our flooring range if the floor is changing too.

Read next

Common Questions

Yes. Drywall is the common name for a metal frame covered on both sides with gypsum board. In Singapore you will see it called a gypsum partition, a gypsum board wall or drywall, and they all describe the same build. Once it is skimmed and painted, it looks like any other wall in the room.

No. HDB lists a gypsum partition as work that needs no renovation permit, with conditions. If it creates a room for habitation, that room needs adequate natural light and ventilation. The fire escape route must stay direct, not through another room. All fasteners can be no more than 6mm in diameter and 40mm in penetration depth. Removing a drywall later does need a permit.

No partition is fully soundproof. A drywall cuts noise rather than stopping it. Rock wool inside the frame helps, and so does taking the wall right up to the ceiling. Doors and gaps still let sound through, so for a quiet study or bedroom, think about the door as carefully as the wall itself. We go through this at the site visit.

Plan it before the wall is built. If a TV, wall cabinets or loaded shelves will hang on the new wall, tell us at the site visit, because it can change which wall we suggest. A 63mm hollow block wall, plastered on both sides, feels more solid, though it takes longer to build and needs an RC lintol over any opening.

It depends on the room. Gypsum is lighter and quicker to put up, so it suits most rooms and offices. A 63mm hollow block wall feels more solid, but it needs plastering on both sides and an RC lintol over any door or window opening. Neither needs an HDB permit if the conditions are met. We advise at the free site visit.

We quote each partition per project after a free site visit, rather than at a published rate. We build the wall, fit the door and finish the floor around it with our own crew. Send Kayler a photo of the room and your unit type on WhatsApp at +65 8118 5520, and we usually reply the same day.

Splitting one room into two?

Send Kayler a photo of the room and your unit type. At the free site visit we mark where the wall goes and check light, air and the way out before we quote.

WhatsApp Kayler or call Kayler on +65 8118 5520